Reverse Power Protection.







1- Protection against overspend   32G (# 1).
     
In case of Turbine Failure, the Turbine is tripped and then the Generator is tripped by operation of reverse power relay to prevent overspending of the Turbine generator unit.

2- Protection against generator motoring   32G (#2).
    
-Generator motoring protection is designed for the prime mover or the system, rather than for the generator.
     
- With steam turbines, Turbines will overheat on low steam flow, motoring results from a low input To the Ac Generator,
     
- When This I/P can’t meet all the losses, the deficiency is supplied by absorbing real power from the system.
    
- since field excitation should remain the same , the same reactive power would flow as before motoring , thus, on motoring the real power will be into the generator, while the reactive power may be either flowing out or into the generator








Setting of Reverse Power Relays

Data for setting calculations
-Rated Capacity of Generator -------- 440,000 KVA
-No Load Loss of Generator --------- 1,785 KW
-No Load Loss of Turbine   ---------- 1,350 KW
-No Load Loss of TG unit ---------- 3,135 KW
-Permissible Motoring Time ------- 60 Sec.
-Relay Constant    ------------------- 1 P.U. = Generator KVA



Setting Of Reveres Power Relay   32G ( #1 )

1- Reverse Power Trip Level

Trip Level < No load loss of TG unit * 0.3
                  = 3,135 * 0.3
                 = 940.5 KW
Pick up    = Trip level / relay constant
                = 941 / 440,000
               = 0.0021  P.U.
Setting   = - 0.002  P.U.    ( 880KW )

2- Reverse Power Trip Delay

Trip Delay < Perm. Motoring time (60 Sec.)
Setting       = 50 Cycles   (1 Sec.)






Setting Of Reveres Power Relay   32G ( #2 )

1- Reverse Power Trip Level

Trip Level < No load loss of TG unit * 0.5
                  = 3,135 * 0.5
                 = 1,568 KW
Pick up    = Trip level / relay constant
                = 1,568 / 440,000
               = 0.004  P.U.
Setting   = - 0.004  P.U.    ( 1,760KW )

2- Reverse Power Trip Delay

Trip Delay < Perm. Motoring time (60 Sec.)
Setting       = 750 Cycles   (15 Sec.)








- Moroccan Man Kills Swedish Tourist In Attempted Sexual Assault, Hurts Another
While they were on a holiday trip in Spain: (Apparently, both tourists) met a young 30-year-old Moroccan in a nightclub who was staying for the night at the same hotel as them but in a different room.At 04:00 a. m., the alleged murderer went...

- We Are All Danes Now!
“Hold your ground, hold your ground. Sons of Gondor, of Rohan, my brothers. I see in your eyes the same fear that would take the heart of me. A day may come when the courage of men fails, when we forsake our friends and break all bonds of fellowship,...

- Palestinian Jokes
So this Palestinian walks into a bar and sits down. The bartender says, “What’ll it be, pal?” The Palestinian goes, “BOOM!” *   *   *   *   *   *   *   *   *   *   *...

- Spare Change?
  It’s no surprise that Hamas considers the cutoff of foreign money to be “blackmail.” After all, that’s what a teenager always considers the threatened withholding of his allowance to be. “Dad! You can’t do that; it’s not fair!”...

- Dhimmied Down Again
Dhimmification continues. In a review from Newsweek you can find the latest on offer: a sitcom — actually, they term it a “drama” — on HBO about polygamy. Don’t ask why, maybe they just figured it might draw an audience. Essentially, the plot...



Green Energy








.