YESTERDAY ,  We made a test at our power station ( 2*350 MW - Gas/Oil Fired ) , this test is LOAD SWING TEST.

This test is implies the load of the unit at 350MW , for a while . and collect our data from the unit especially the boiler and Turbine system. , Then Decrease the sharply to the lowest load at 250 MW .
Hold time at this minimum load  and collect data , and identify the performance of BOILER MASTER and GOVERNOR behaviors, and judge on the performance for these equipment.

Repeat this swing two and three times about this range , and collect the data for the system.

What Happened with our unit ??
It is noted that when decreasing the load , the water heaters ( Medium Pressure Heaters ) are going out of service because of hi level , this is very dangerous for the behavior of steam unit.
because when water heaters , the cascaded drains causes to trip all the heaters from service , and suddenly the load may increase sharply , especially the high pressure heaters. 




- Boiler (steam Generator)
Boiler  (Steam Generator) -The boiler for 1,094 t/h MCR is Single Drum Radiant Natural Circulation Boiler “ELPASO” Type which has self-drainable heating surface.  The unit is of pressurized furnace design with two regenerative air heaters,...

- Advanced Process Controller (apc) For Controlling Steam Power Plant {part 2}.
Advantages of an Advanced Process Controller Figure 5 The APC-based unit control concept for main steam pressure control Figure 5 can be differentiated from the conventional unit control approach in several important ways: The APC is able...

- Advanced Process Controller (apc) For Controlling Steam Power Plant {part 1}.
"Control of Steam Power Plant is very big job need Care to fulfill the appropriate degree of stability and dependability for such this big system " In many countries, plants have to fulfill specific requirements of the electrical grid (such as frequency...

- Reverse Power Protection., Theory & Setting .
Reverse Power Protection. 1- Protection against overspend   32G (# 1).      In case of Turbine Failure, the Turbine is tripped and then the Generator is tripped by operation of reverse power relay to prevent overspending...

- Over Frquency Happened At A Windy Winter Night..
SUNDAY, DECEMBER 12, 2010 “ at 3:00 am , A sudden frequency fluctuation happened , that cause the MW output fluctuate with the grid frequency , Unit 7 was at Coordinated Mode ( Boiler Master – Auto  , Turbine Set – Auto ) ,  The load fluctuated...